搜索
攀岩

技术教学帖:Petzl攀岩之旅——多段结组攀登中的绳索技术(转帖)

[复制链接] 查看:71054 | 回复:108
发表于 2013-9-24 17:12 1 只看该作者 | 倒序浏览 | 只看本帖大图
Petzl网站上一篇关于结组攀登的文章,岩友Steven/小彭已经把它全部翻译完成。现与广大岩友分享。对想要进行结组攀登的岩友来说,是一篇很好的理论入门教学!


Petzl 网站原文链接 https://www.petzl.com/en/outdoor/



现在英西结组线路越来越多,大家也爬得越来越High,有些系统学习过,有些可能只是有些模糊的概念就上了,高兴归高兴,安全还是要考虑的。这篇文章转自Petzl网站https://www.petzl.com/en/outdoor/ ... ulti-pitch-climbing,我感觉还是有价值的,介绍了些结组攀登中基础的技术,翻译了一小部分,相当费劲,错误请大家指正,因为我这方面经验也不足,大家仅当参考!


Petzl攀岩之旅:多段结组攀登中的绳索技术


翻译:Steven/小彭


With only a few days left until the Petzl Roc Trip, we thought it would be a good time to go over some bASIc rope handling techniques for multi-pitch sport climbing. The objective here is not to go in great detail about the activity itself, but rather to highlight the basics and go over some tips that will make climbing multi-pitch routes more enjoyable. The photos in this article are only meant for demonstration and have no technical purpose.
离Petzl的攀岩旅行还有几天,现在回顾一下多段结组运动攀登的基本绳索操作技术正是好时候。当然我们的主题不是详细介绍这次活动的细节,而是强调基本技术和一些小技巧,熟练掌握这些将使你更能享受多段结组攀登的乐趣。本文中的图片只是示范,无技术指导目的。

10人 评分 查看全部评分
12人点评 收起
发表于 2013-9-24 17:12 2 只看该作者
本帖最后由 疯岩风语 于 2013-9-24 17:14 编辑


技术教学帖:Petzl攀岩之旅——多段结组攀登中的绳索技术(转帖)



The beautiful lines of Cathédrale are waiting for climbers at the Petzl Roc Trip.
在Petzl攀岩之旅中,等待攀岩者攀登的漂亮线路Cathédrale

The Gorges de la Jonte have many classic three- to five-pitch sport routes rated from 4+ to 6b. Most of the routes have been re-equipped with glue-in bolts and don't require cams or other traditional protection. However, the re-equipping was done in the spirit of the original ascent. While the chances of a potentially dangerous ledge fall have been minimized, it doesn't mean that the routes are bolt ladders. Even on the routes rated in the 5's can be a little run-out.
de la Jonte峡谷有许多经典的3段到5段结组线路,难度从4+到6b不等。大部分的线路已经重新更换了化学螺栓挂片(是否是泰国那种用胶的?),不需要凸轮机械塞或其他传统攀登的器械来设置保护。当然,重修线路是在原始攀登的精神下进行的。虽然在一个存在潜在危险的平台脱落的几率已经被最小化,但并不表示螺栓挂片如梯子般密集,即使在5的线路上也可能有几个大跨度的挂片!


发表于 2013-9-24 17:12 3 只看该作者
本帖最后由 疯岩风语 于 2013-9-24 17:15 编辑



技术教学帖:Petzl攀岩之旅——多段结组攀登中的绳索技术(转帖)



Crowds on on the first belay acnhors at the "Diagonale du Gogol" sector.A jumble of climbing teams crossing each other while others are rappelling.A helmet is highly recommended.
攀爬者拥挤在Diagonale du Gogol的第一段保护站。不同攀爬团队混杂的通过保护点或利用保护点下降,强烈推荐佩戴头盔。

Climbing has become more and more popular, as evidenced by the crowds at this cliff earlier this spring. The first thing we noticed: even on this warm weekend, most all of the climbers were wearing helmets. Without a doubt, the technical improvements over the recent years that have allowed helmets to be lighter, more comfortable, well-ventilated and good-looking mean that there is no longer any excuse for not wearing one. Not only do they help protect your head from falling rocks and other objects, but helmets also help protect from impacts as a result of a fall.
早春时来到这个岩壁的人群,证明了攀岩变得越来越受欢。第一件事情引起我们注意的是:即使在这样炎热的周末,大多数攀登者戴了头盔。毫无疑问,近年来的技术改进使头盔变得更轻,更舒适,也更通风,外形也变得漂亮了很多,因此以前不愿意戴头盔的理由都已不构成理由了。头盔不仅保护你不受落石和其他坠落物的威胁,也可以使你在冲坠时避免头部受到冲击。


发表于 2013-9-24 17:12 4 只看该作者
本帖最后由 疯岩风语 于 2013-9-24 17:16 编辑

技术教学帖:Petzl攀岩之旅——多段结组攀登中的绳索技术(转帖)




Falling
Attention : make sure the rope does not run under your leg
冲坠
注意:不要让绳索留在腿后(这样可以避免如上图的头朝下冲坠)

Things get complicated at the belay, where rope management plays a key role in the helping ensure climbing safety. In general, things go pretty well when the belays are equipped with glue-in bolts linked by a chain 1.5m above a nice big ledge. But in reality, it becomes more complicated when there's not a ledge, when there's no chain between the bolts, when more than one climbing party is sharing the same anchor, when your climbing in a party of three or when the same person is leading the entire route, etc.
保护时事情变得有点复杂,这时绳索的处理对确保安全攀爬起了关键的作用。总的说来,当保护站设置在一个理想的大平台上方1.5m处,并由钢链连接在一起的多个化学螺栓组成时,操作会很顺利。但实际上,当没有平台,或没有钢链连接螺栓挂片,当不止一个攀登团队共用一个保护站,或者在一个三人的团队里,一个人始终领攀整条线路时,保护就变得很复杂。




1人 评分 查看全部评分
1人点评 收起
发表于 2013-9-24 17:12 5 只看该作者
本帖最后由 疯岩风语 于 2013-9-24 17:17 编辑

技术教学帖:Petzl攀岩之旅——多段结组攀登中的绳索技术(转帖)



Second belay station on Biotone. A station like this requires very a organized set-up adapted to the situation. Above, a climber from one party has just started a pitch as a climber from another party has just arrived at the belay...
More in detail, we can see the first piece is not clipped. The leader has already clipped several bolts, so the belayer can free the redirect bolt for the next team. A situation to be ancipated...
Biotone线路上的第二个保护站。像这样的保护站需要很有条理的安排来应对此时的情形。上面一个团队的攀爬者已开始攀登下一段,同时另一个团队的一名攀爬者刚到达保护站。更详细点的话,我们可以看到第一个快挂没有挂绳。领攀的人已经将绳子挂入几个块挂,所以保护者可以将保护站用于绳索变向的挂片留给下一个团队的人用。这种情况可以预想到。。。

In every case, it's important to follow these rules:
Everyone is directly or indirectly clipped to 2 separate anchors (using locking carabiners). Attaching the climbing rope with a clove-hitch to the anchor allows for simple adjustments so there's no slack in the system. Never rely on a single carabiner at the belay station!
Keep the belay station simple and well-organized.
在任何情况下,遵守下面的原则非常的重要:
**每个人必须直接或间接固定在2个以上分开的锚点/保护点上(用带锁的铁锁)。
**利用容易调节绳子长度的双套结连接主绳,使在整个保护系统中没有松懈的部分。在确保站上,永远不要只依靠单个铁锁保护。
**保持确保站简单明了和井然有序。



1人点评 收起
发表于 2013-9-24 17:12 6 只看该作者
本帖最后由 疯岩风语 于 2013-9-24 17:18 编辑

技术教学帖:Petzl攀岩之旅——多段结组攀登中的绳索技术(转帖)




Belay used when swapping leads:
Belay station using a sling. Each rope is attached individually to each bolt with a clove hitch.
The locking carabiner and belay device are attached with a clove hitch.
Both bolts are equalized.
交替领攀时的确保方法:
**保护站利用一条扁带连接。每条绳用双套结分别独立连接到每个单独的挂片上。
**锁住保护器的铁锁连接在双套结上。
**2个挂片的受力平均。
2人点评 收起
发表于 2013-9-24 17:12 7 只看该作者
本帖最后由 疯岩风语 于 2013-9-24 17:22 编辑



技术教学帖:Petzl攀岩之旅——多段结组攀登中的绳索技术(转帖)



Belay station using the rope and two clove hitches.
To be used only when both anchors are deemed to be solid.
保护站用主绳和2个双套结连接。
只有在确信2个锚点/保护点都牢固的情况下方可使用。

1人点评 收起
发表于 2013-9-24 17:12 8 只看该作者
本帖最后由 疯岩风语 于 2013-9-24 17:24 编辑

技术教学帖:Petzl攀岩之旅——多段结组攀登中的绳索技术(转帖)



Clove hitch for tying off at the anchor
在锚点处打双套结的方法。


When the leader is building the belay, s/he should try to anticipate rope management needs for the next pitch. There are different techniques for this, depending on the situation: whether the team is swapping leads, the same person is leading the entire route, or if its a team of three.
当领攀者在设置确保时,她/他应该预先想到为下一段线路理绳的需要。这种情况下有不同的技术,要看当时的情况而定:如交替领攀的团队,一直同一个人领攀整条线路的团队,或者3个人结组的团队。
1人点评 收起
发表于 2013-9-24 17:12 9 只看该作者
本帖最后由 疯岩风语 于 2013-9-24 17:27 编辑

下图:
交替领攀(注意:图上的情况是双绳攀登技术,单绳攀登时可能用的方法不同,但原理基本相同):
1. 到达保护站:检查锚点,确定牢固后固定自己。
2. 用双套结将一个铁锁固定在扁带上。
3. 确保跟攀的第二攀登者。
4. 第二个攀登者到达保护站并固定好自己后,整理装备,准备开始领攀。
5. 将确保绳索放入定向锚点。
6. 第二个攀登者成为领攀者。



技术教学帖:Petzl攀岩之旅——多段结组攀登中的绳索技术(转帖)

1人点评 收起
发表于 2013-9-24 17:12 10 只看该作者
技术教学帖:Petzl攀岩之旅——多段结组攀登中的绳索技术(转帖)

2人点评 收起
你需要登录后才可以回帖 登录 | 注册 |